2.4 KiB
2.4 KiB
Consolidated Plus implementation
Based on complete upstream history through
8b8cf72d1f.
- Added original-firmware Sound & Speech hardware, runtime chip-ROM loading, readiness/error reporting and exclusive SSC/extended-palette register ownership.
- Added four configurable Multi-Pak sockets, independent routing/banks, singleton built-in device moves and a bounded shared program-ROM pool.
- Reorganized controls into nine stable VCC Plus-inspired pages while preserving floppy, SDC/OS9, cassette, audio, video, input, UART and machine functions.
- Repaired clock/reset/phase boundaries, CPU/SDRAM handshakes, video activation timing and source-matched external-I/O constraints under the documented profile.
- Corrected early remembered-ROM loading and deferred status normalization for saved non-default layouts with the unmodified MiSTer Main initialization order.
- Added independent Windows tool downloads, ToolShed ROM assembly, fresh native Quartus builds, functional/fitted timing checks, copyable release overlays and checked passwordless-SSH installation with rollback.
- Preserved original history/attribution and documented contribution licensing, assumptions, ROM requirements, test results and remaining physical limits.
See docs/BUG_FIXES.md for causes/checks, docs/FEATURES.md for behavior, docs/MENUS.md for the complete tree and docs/VALIDATION.md for acceptance scope.
Release tooling and attribution review
- Selected Greg Miller's original Standard BSD license option, preserving its complete notice and documenting pinned provenance instead of an unverified public-domain assumption. Other inherited-asset review remains explicit.
- Export notices from committed Git blobs only; exclude untracked local files. Limit downloadable source selections and provide a pinned full-clone build route.
- Require a current inventory identity and complete qualified build-input set before packaging, rejecting legacy/stale receipts without rewriting evidence.
- Stage and verify all supporting files before atomic launcher activation; preserve planned/failed installation receipts and rollback locations.
- Separate measured timing paths from empty asynchronous checks and identify the earlier extensive hardware test image separately from final startup checks.
These changes do not modify the FPGA hardware implementation or timing constraints.